Project is Putting the Beach Back in Apollo Beach

The wheels of heavy equipment are turning as the Beach Restoration Project in Apollo Beach begins. Flores and Harper, a full-service general contractor, is now on-site and moving forward with the four-month project of shoreline restoration.

Bids recently went out for the upcoming dredging operation to be reviewed in early February and then be awarded later in the month, said Len Berkstresser, president of the all-volunteer nonprofit Apollo Beach Waterway Improvement Group, aka ABWIG.

Read the rest of the article using the link below:

http://tbo.com/south-shore/project-is-putting-the-beach-back-in-apollo-beach-20150122/

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *